Latest News

Central Railway will operate Mega Block o­n 09.08.2015

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 9.8.2015.

Central Railway - Mega Block on 03.07.2017

MEGA BLOCK o­n 9.8.2015

Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n 9.8.2015.

MAIN LINE :
MULUND-MATUNGA UP SLOW LINE FROM 11.15 AM TO 3.15 PM

All Up slow line services leaving Thane from 10.41 am to 3.12 pm will be diverted o­n Up fast line between Mulund and Matunga stations halting at Mulund, Bhandup, Vikhroli, Ghatkopar, Kurla and Sion stations and further re-diverted to Up slow line proper at Matunga station.

Up slow line services will not be available at Nahur, Kanjurmarg and Vidhyavihar stations. However passengers of these stations are permitted to travel via Bhandup/ Vikhroli/ Kurla respectively in Dn direction.

Dn fast line services leaving Chhatrapati Shivaji Terminus from 10.08 am to 2.42 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts and arrive destination 20 minutes behind schedule. Up fast line services leaving Thane from 10.46 am to 3.28 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla station in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule.

All Dn and Up slow line services leaving/arriving Chhatrapati Shivaji Terminus between 11.00 am and 5.00 pm will arrive destination 10 minutes behind schedule.

HARBOUR LINE :
KURLA-MANKHURD UP AND DN HARBOUR LINES FROM 11.00 AM TO 3.00 PM.